Co-principal
Investigator (with Leo Bobek) on Project No. 14-08567, "Design,
Construction, and Testing of an Ex-Core Fast Neutron Irradiation
Facility for the UMLRR," Intersil Corporation, Mountaintop,
PA, April 2000 - August 2002.
Principal Investigator on Project No. 05-08620, "Activation
Analysis for the Fermi 1 Reactor," Duke Engineering and Services,
Inc., Marlborough, MA, June 2000 - January 2001.
Principal Investigator on Project No. 05-08453, "Benchmarking
Activation Analysis Techniques," Duke Engineering and Services,
Inc., Marlborough, MA, October 1999 - January 2000.
Research staff directing the "Computational Support for the
HEU to LEU Conversion of the UMLRR." This was part of a larger
project directed by Leo Bobek (Project No. 14-08239-F) for "The
Conversion of the UMass-Lowell Research Reactor from High Enriched
Uranium to Low-Enriched Uranium Fuel," Department of Energy,
January 1999 - December 1999.
Principal Investigator on Project No. 05-08186, "Phase I Computational
Model Development in Support of the HEU to LEU Conversion at the
UMass-Lowell Research Reactor," Aspen Systems, Marlborough,
MA, October 1998 - December 1998.
Principal Investigator on Project No. 05-07895, "Characterization
of the Neutron Spectrum in the UMass-Lowell Research Reactor,"
Aspen Systems, Marlborough, MA, October 1997 - April 1998.
Principal Investigator on Project No. 05-07819, "Preliminary
Characterization of the Neutron Spectrum in the UMass-Lowell Research
Reactor," Aspen Systems, Marlborough, MA, July 1997.
Principal Investigator on Project No. 05-07741, "Development
of the ACTIV Code," Yankee Atomic Electric Company, Bolton,
MA, April 1997 - Sept. 1997.
Principal Investigator on Project No. 05-07140, "Modifications
to the FORSS Code," Knolls Atomic Power Laboratory, Schenectady,
NY, March 1995 - Sept. 1995.
Co-principal Investigator (with Lee Bettenhausen) on Project No.
14-06968, "Determination of Service Life for Excore Detector
Cables in Seabrook Station," North Atlantic Energy Corp, Seabrook,
NH, Sept. 1994 - June 1995.
Principal Investigator on Project No. 05-05842, "Physics Analysis
of the Modular High Temperature Gas-Cooled Reactor (MHTGR),"
Martin Marietta Energy Systems, Inc., Oak Ridge, TN, Feb. 1991 -
Dec. 1991.
Principal Investigator on Project No. 05-05169, "Sensitivity
and Uncertainty Analysis of the High Converter Reactor (HCR),"
Siemens AG, KWU, Federal Republic of Germany, Sept. 1988 - Sept.
1989.
Co-principal Investigator (with Thomas Wallace), "Low Enriched
Fuel Conversion for Research Reactors," Department of Energy,
Washington D.C., Sept. 1986 - Sept. 1988.
Principal Investigator on Project No. 05-03978, "Demonstration
of Generalized Perturbation Methods for LWR Applications,"
Westinghouse Electric Corporation, Pittsburgh, PA., Jan. 1984 -
Jan. 1987.
Principal Investigator on Project No. 05-03841, "Physics Analyses
of the High Temperature Gas-Cooled Reactor (HTGR)," Martin
Marietta Energy Systems, Inc., Oak Ridge, TN, Oct. 1983 - June 1985.
Principal Investigator on Project No. 05-03606, "Large Core
Design Methods and Applications," Union Carbide Corporation,
Oak Ridge, TN., Sept. 1982 - March 1984.